Pittini Group for the futuristic Storstrøm Bridge in Denmark
Quality, availability, and logistics. Being able to fully meet these requirements has led the Danish Road Directorate of Denmark’s Department for Transport to rely on Pittini Group for the construction of the innovative Storstrøm Bridge.
The futuristic Danish bridge will be crossed by a two-lane road, a double railway track for high-speed trains, as well as by a pedestrian and bicycle lane. Six and a half kilometers of steel for a total value of about €277 million.
Pittini Group has been selected to supply 2,000 tons of JUMBO® coil that will be shaped according to the installation foundation drawings. The stock availability of the whole range and the possibility to ship the coils by train in covered wagons – to prevent rust – played a fundamental role during the evaluation phase. The choice of rail transport testifies once again the green commitment of Pittini, which has always been at the forefront of environmental protection. As proof of this, JUMBO® is EPD certified, as required by the most modern construction criteria in terms of eco-sustainability.
The construction work is scheduled to be completed in the second half of 2022.
To find out more, please visit the corporate blog >>>
- Wire rod •
- Flat products •
- Long products •
- Other materials •
- Metal wire •
- Drawn wire for springs •
- Drawn wire for construction •
- Flat bars •
- Round wire rod •
- Flat bars and wide flats •
- Rolled wire •
- Copper plated wire •
- Other drawn wire •
- Concrete reinforcement wire •
- Welding wire
- Wire mesh •
- Electrowelded mesh