Continuus-Properzi SpA
Wire drawing machines
Badge for sponsor companies
ITItaly
1947
51-200

PC Strand Lines “Pre-stressed Concrete” 1+18

PC Strand Lines “Pre-stressed Concrete” 1+18
PC Strand Lines “Pre-stressed Concrete” 1+18.

PC Strand Lines “Pre-stressed Concrete” for strand configuration 1+18.
undefined
last updated on
Friday, April 4, 2025
Belonging categories: